Smart Grid Demonstration Project

Provided consultant staff for Project Management Team and Electric Vehicle (EV) Project under the $120M Smart Grid Demonstration Project (SGDP)

• Project Coordination for the $120M LADWP SGRDP, involving LADWP, USC, UCLA, & JPL

• Managed master scheduling, documentation support & quality control for all SGRDP documentation, including new operations, process manuals, design, demonstration functional requirements, equipment & materials acquisition, invoicing, expenditure & installation logs, project meeting agendas, meeting minutes, & action item lists 

• Budget analysis for SGRDP, including federal DOE, ARRA, City of Los Angeles, & LADWP Power System Information & Advanced Technology (PSIAT) department

• Responsible for all operational & developmental SGRDP reporting & quality control to DOE, ARRA, CEC, & City of Los Angeles, including DOE monthly progress reports, Standard Form 425, & OMB 1512 Quarterly Reports, Metrics & Benefits reports, labor & materials invoicing, health status reports, expense calculator, job calculator & job creation reports 

• Defined SGRDP reporting processes & procedural diagrams, schedules & manuals

• Researched, analyzed, composed current & future state assessments, gap analysis, issues, & integration architecture reports to integrate current LADWP legacy systems with new GIS architecture & replacement systems=

• Established tracking procedures & facilitated coordination among SGRDP project teams in the areas of Advanced Metering Infrastructure, Customer Behavior, Cyber Security, Demand Response, & Electric Vehicles.

Solar World Inc. Project

Provided consultant staff for Administrative Management services.  

  • Coordinated and created the installation manual and training workshops for City of Los Angeles Department of Water and Power. 

  • Assigned, scheduled, trained, reviewed, and monitored project work to ensure that progress was within the expected guidelines and was completed on time and within budget. 

  • Responsible for developing the project timelines, deliverables and accountabilities for SolarWorld’s proprietary Sunfix Ground Mounting System and Tilt Version System to be installed at the Adelanto Switching and Convertor Station